ANOTHER LOCAL BRIDGE GETS STUCK “UP”
This time, it was Stone Harbor’s turn to get a county bridge stuck in the upright position. A piece of concrete became wedged in machinery on the 96th Street drawbridge on Tuesday, causing the bridge to malfunction in the “up” position for nearly an hour and a half. Motorists had to use Avalon Boulevard or…